供水设施在法官湾安装了13.2M美元的废水泵站,以减少溢出量和改善水质。 Watercare installs a $13.2M wastewater pump station in Judges Bay to reduce overflows and improve water quality.
供水部门已在新西兰法官湾安装了一个新的1 320万美元的废水泵站,以提高当地废水网络能力,减少湿天气溢流。 Watercare has installed a new $13.2 million wastewater pump station at Judges Bay, New Zealand, to increase local wastewater network capacity and reduce wet weather overflows. 该项目包括两条新的废水管道,目的是提高贝法官长期的Safeswim黑针地位。 The project includes two new wastewater pipelines and aims to lift the long-term Safeswim black pin status at Judges Bay. 预计到2025年7月完成升级,这将加强水路保护和网络复原力。 Expected to be completed by July 2025, the upgrades will enhance waterway protection and network resilience.