Watercare完成了$21.5M的East Coast Bays Link下水道项目,使废水输送能力翻了一番。 Watercare completes $21.5M East Coast Bays Link Sewer project, doubling wastewater transmission capacity.
Watercare 完成了耗资 2150 万美元的东海岸 Bays Link 下水道项目,将废水输送能力提高了一倍。 Watercare completes the $21.5 million East Coast Bays Link Sewer project, increasing wastewater transmission capacity by double. 1.75公里直径800毫米的管道将Mairangi Bay泵站连接到Rosedale废水处理厂,利用横向钻井尽量减少环境影响和交通中断。 The 1.75 km, 800 mm diameter pipeline connects Mairangi Bay Pump Station to Rosedale Wastewater Treatment Plant, using horizontal drilling to minimize environmental impact and traffic disruptions. 该地区废水服务的未来改进包括调查坑洞、清洁网络和进行闭路电视检查。 Future improvements to wastewater services in the area include investigating manholes, cleaning networks, and conducting CCTV inspections.