艾伯塔省暂停使用可再生能源7个月,导致53个项目被取消。 7-month Alberta moratorium on renewable power approvals led to cancellation of 53 projects.
艾伯塔省暂停使用可再生能源7个月,导致53个风能和太阳能项目被取消,根据清洁能源智囊团Pembina研究所的报告,使该省处于法律不确定状态。 Alberta's seven-month moratorium on renewable power approvals resulted in 53 wind and solar projects being cancelled and left the province with legal uncertainty, according to a report by clean energy think tank, The Pembina Institute. 这项暂停措施旨在评估可再生能源项目对农业、环境、城市和“原始景观”的影响,导致最初118个项目中的33个项目通知系统操作员,它们打算继续取消。 The moratorium, which aimed to assess the effects of renewable energy projects on agriculture, the environment, municipalities, and "pristine viewscapes," led to 33 of the initial 118 projects notifying the system operator of their intention to proceed being cancelled. 该报告还发现,有20个项目试图通过“分组”其提案向前迈进,希望能够被批准,但这些项目后来被取消。 The report also found that 20 projects tried to move forward by "clustering" their proposals in hopes of being grandfathered, but these projects have since been cancelled. 艾伯塔省的负担能力和公用事业部长纳森·诺多夫称这份报告是"错误的信息". Alberta's minister of affordability and utilities, Nathan Neudorf, called the report "misinformation."