计划利用联邦资金在主要高速公路上设立18个新的EV收费站。 18 new EV charging stations planned on major highways using federal funds.
亚利桑那州交通部(ADOT)计划利用国家电动车辆基础设施方案(NEVI)的联邦资金,在I-40和I-17等主要高速公路上建造18个新的EV收费站。 The Arizona Department of Transportation (ADOT) plans to build 18 new EV charging stations on major highways like I-40 and I-17, using federal funds from the National Electric Vehicle Infrastructure Program (NEVI). 私人拥有和运营的加油站将安装在现有加油站、旅行中心和旅馆,预计建筑需要一年时间,一些加油站将在2025年底启用。 The privately owned and operated stations will be installed in existing gas stations, travel centers, and hotels, and construction is expected to take a year, with some stations opening by late 2025. 目的是减少距离焦虑,鼓励更多人改用电动车辆。 The aim is to reduce range anxiety and encourage more people to switch to electric vehicles.