斯托克顿海项目于3月开始使用8,500岩石, 以防止侵蚀和海平面上升.
Stockton seawall project begins March using 8,500 tons of rock to protect against erosion and rising sea levels.
为了加强斯托克顿米切尔街海的500万美元项目将于下个月开始, 使用8500岩石来保护结构免受侵蚀和海平面上升.
A $5 million project to reinforce Stockton’s Mitchell Street seawall begins next month, using 8,500 tonnes of rock to protect the structure from erosion and rising sea levels.
作为扩展斯托克顿海岸管理计划的一部分, 这项升级将提高海的高度以减少浪潮超标并保护附近的房屋和公用事业.
The upgrade, part of the Extended Stockton Coastal Management Program, will raise the seawall’s height to reduce wave overtopping and safeguard nearby homes and utilities.
工程包括更换受损的岩石和修复雨水出水口,预计将在明年初完成.
Work includes replacing damaged rocks and repairing stormwater outlets, with completion expected by early next year.