2026年6月1日,布里斯班的新奥运会体育场开始建设.该体育馆将容纳63000人参加2032年的奥运运动会,取代了加巴体育中心.
Construction begins June 1, 2026, on Brisbane’s new 63,000-seat Olympic stadium for the 2032 Games, replacing the Gabba.
布里斯班的新奥运会体育场将于2026年6月1日开始建设,该体育馆将为2032年奥运赛举办田径和仪式.
Construction on Brisbane’s new Olympic stadium, set to host athletics and ceremonies for the 2032 Games, begins June 1, 2026, the Crisafulli government confirmed.
这座拥有63000个席位的场馆由包括考克斯建筑,哈塞尔和阿苏萨·谢凯在内的联盟设计. 里面有三层碗,企业级别,光环视频板以及空气流通的开放端.
Designed by a consortium including Cox Architecture, Hassell, and Azusa Sekkei, the 63,000-seat venue will feature a three-tier bowl, corporate tiers, a halo video board, and open ends for airflow.
赛后,它将取代加巴作为布里斯班的主要AFL和板球场所.
It will replace the Gabba as Brisbane’s primary AFL and cricket venue after the Games, with the Gabba slated for demolition.
位于QUT的凯尔文园附近的一个山谷是可能的地点,尽管最终位置仍未得到确认.
A valley near QUT’s Kelvin Grove campus is a likely site, though the final location remains unconfirmed.
基础设施建设工作在2032年奥运会之前仍在继续.
Infrastructure work continues ahead of the 2032 Olympics.