2026年4月,安大略省巴黎市中心的建设恢复. 改建包括新的人行道,道路和步行区,并暂时改变交通流量.
Construction resumes April 2026 on Paris, Ont.’s downtown upgrade, including new sidewalks, roads, and a pedestrian zone, with temporary traffic changes.
安大略省巴黎市中心挖掘项目将于2026年4月初恢复建设,包括从机械街到威廉街的公用事业,道路,人行道和街景的大型升级.
Construction on Paris, Ontario’s Downtown Dig project will resume in early April 2026, involving major upgrades to utilities, roads, sidewalks, and streetscapes from Mechanic Street to William Street.
一个名为"巴黎步道"的仅供行人使用的区域将沿着北大河街建立.
A pedestrian-only zone called the Paris Promenade will be established along Grand River Street North.
关闭主要道路和临时单向交通模式将影响几个街道, 重型卡车和配送的绕行.
Key road closures and temporary one-way traffic patterns will affect several streets, with detours for heavy trucks and deliveries.
地方通道仍然可用,但从弗里斯街向国王爱德华街的左转是禁止的.
Local access remains available, but left turns onto King Edward Street from Dumfries Street are prohibited.
尽管短期的中断,但该长期项目旨在改善市中心基础设施,恢复力和可访问性.
The long-term project aims to improve downtown infrastructure, resilience, and accessibility despite short-term disruptions.