已经开始一项价值27亿美元的项目, 以现代化改造阿拉斯加最大港口码头. 将老旧基础设施替换为新的杆,起重机和码头以提高安全性和供应链弹性.
A $2.7 billion project to modernize Alaska’s largest port terminal has begun, replacing aging infrastructure with new pilings, cranes, and docks to improve safety and supply chain resilience.
阿拉斯加的唐港货运码头1号已经开始建设, 耗资27亿美元. 这是该港口历史上最大规模的翻新工程.
Construction has begun on a $2.7 billion modernization of the Don Young Port of Alaska’s Cargo Terminal 1, the largest renovation in the port’s history.
项目旨在替代因腐蚀和地震威胁而面临崩的老旧基础设施, 包括安装新的240英尺柱子,升级为更大的起重机以及扩大码头.
The project, aimed at replacing aging infrastructure at risk of collapse due to corrosion and seismic threats, includes installing new 240-foot pilings, upgrading to larger cranes, and expanding the dock.
预计将持续到2029年或2032年的工程, 由收入债券,港口附加费和5000万美元的联邦拨款资助.
Work, expected to continue through 2029 or 2032, is funded by revenue bonds, port surcharges, and a $50 million federal grant.
虽然运营将继续,但费用增加可能会提高消费者成本.
While operations will continue with minimal disruption, increased fees may raise consumer costs.
这些升级对于提高阿拉斯加供应链的弹性和支持未来经济增长至关重要.
The upgrades are critical to enhancing Alaska’s supply chain resilience and supporting future economic growth.