由于高品质和矿回收, 奥里克采矿公司在西澳大利亚的蒙达金坑超过了黄金生产目标46%.
Auric Mining exceeded gold production targets at Western Australia’s Munda pit by 46%, driven by strong grades and mill recovery.
澳洲西部蒙达矿井的黄金产量超过了目标,达到46%,生产8886司.
Auric Mining exceeded its gold production target at Western Australia’s Munda starter pit by 46%, producing 8,886 ounces—well above the 6,100-ounce forecast.
通过与黑猫集团的收费处理协议,在Lakewood Mill进行了两次活动,取得强的结果.第二个运动从68,154中回收了6,168司,每头3.18g/t.
Strong results came from two campaigns processed at the Lakewood Mill via a toll-treating deal with Black Cat Syndicate, with Campaign Two recovering 6,168 ounces from 68,154 tonnes at a 3.18g/t head grade.
平均度为2.46g/t,比预期高37%,磨坊回收率达到89.5%,超过了预期.
The reconciled average grade was 2.46g/t, 37% higher than forecast, and mill recovery reached 89.5%, surpassing expectations.
另外411司的黄金在循环中得到证实,
Additional 411 ounces from final gold-in-circuit results confirmed the deposit’s potential, especially at depth.
没有拥有磨坊的成功,加强了Auric在更大的Munda主坑前面的财务和地质地位. 目前正在更新资源模型以反映新的高档区域.
The success, achieved without owning a mill, strengthens Auric’s financial and geological position ahead of the larger Munda Main Pit, with a resource model update underway to reflect new high-grade zones.