Adani Group计划每年对基础设施投资2万卢比, 以至2030年提升印度贸易和能源安全。
Adani Group plans Rs 2 lakh crore annual investment in infrastructure to boost India’s trade and energy security by 2030.
2026年3月13日, Adani Ports 总裁Karan Adani指出, Adani Group计划在未来五年每年投资2万卢比用于绿地基础设施项目,以加强印度在全球混乱中的贸易、物流和能源安全。 2026年3月13日,Adani Ports总经理Karan Adani表示,Adani Group计划在未来五年内每年投资2万卢比,用于绿地基础设施项目,以加强印度的贸易、物流和能源安全。
Karan Adani, Managing Director of Adani Ports, stated on March 13, 2026, that the Adani Group plans to invest Rs 2 lakh crore annually over the next five years in greenfield infrastructure projects to strengthen India’s trade, logistics, and energy security amid global disruptions.
该小组的目标是将港口能力增加一倍,达到12亿公吨,将可再生能源扩大到50千兆瓦,将热电增加到45千兆瓦,到2030年将机场客运量提高到每年2亿。
The group aims to double port capacity to 1,200 million metric tonnes, expand renewable energy to 50 gigawatts, increase thermal power to 45 gigawatts, and raise airport passenger handling to 200 million annually by 2030.
该战略侧重于复原力、整合和可持续性,强调降低物流成本,加强供应链安全,并扩大到电池储存、防御和材料等部门。
Focused on resilience, integration, and sustainability, the strategy emphasizes reducing logistics costs, enhancing supply chain security, and expanding into sectors like battery storage, defense, and materials.
Adani强调增长必须以责任、治理和国家发展为指导。
Adani stressed that growth must be guided by responsibility, governance, and national development.