桑托斯批准了一个3.57亿美元的项目,用一个电力设施取代旧的加油站,削减费用、排放和提高南澳大利亚的能源安全。
Santos approved a $357 million project to replace old gas stations with one electric facility, cutting costs, emissions, and boosting energy security in South Australia.
桑托斯已核准在南澳大利亚州库珀盆地实施3.57亿美元的Moomba中央优化项目, 以单一电动设施取代七个老化气体驱动压缩机站。
Santos has approved the $357 million Moomba Central Optimisation project in South Australia’s Cooper Basin, replacing seven aging gas-driven compressor stations with a single electric-driven facility.
该项目为期三年,旨在削减单位生产成本,每桶石油当量最高减少3美元,节省6亿多美元,每年将第1范围排放量减少40,000吨二氧化碳当量。
The three-year project aims to cut unit production costs by up to $3 per barrel of oil equivalent, deliver over $600 million in savings, and reduce Scope 1 emissions by 40,000 tonnes of CO2 equivalent annually.
它支持向南澳大利亚州战略天然气储备提供长期天然气供应,从2030年到2040年,从2030年到2040年的20个Petajoule年度供应协议提供预先付款资金,帮助为升级提供资金。
It supports long-term gas supply to South Australia’s Strategic Gas Reserve, with prepayment funds from a 20-petajoule annual supply deal from 2030 to 2040 helping finance the upgrade.
该倡议提高了效率,打开了中央领域增长的大门,并加强了区域能源安全。
The initiative enhances efficiency, unlocks growth in the Central Fields, and strengthens regional energy security.