Aureka将St Arnaud黄金项目许可证展期至2030年,拥有丰富的资源和高水平的钻探结果。
Aureka extends St Arnaud gold project licence to 2030 with strong resource and high-grade drill results.
Aureka有限公司已将其维多利亚州St Arnaud Comstock黄金项目的勘探许可证延长到2030年,从而得以进一步发展。
Aureka Limited has extended its exploration licence for the St Arnaud Comstock gold project in Victoria until 2030, enabling further development.
高分辨率的LIDAR和摄影测量测量调查创建了该场址的详细数字模型,为地质和业务规划提供了支持。
A high-resolution LiDAR and photogrammetry survey created a detailed digital model of the site, supporting geological and operational planning.
该项目拥有JORC的初次资源为145万,金价为1.21g/t,最近的钻探产生了高品质的结果,包括1m金价为65.37g/t和650g/t银.
The project holds a maiden JORC resource of 1.45 million tonnes at 1.21 g/t gold, with recent drilling yielding high-grade results, including 1m at 65.37 g/t gold and 650 g/t silver.
矿址位于黄金厂附近,有可能进行第三方加工。
Located near operating gold mills, the site offers potential for third-party processing.
在黄金价格不断上涨的情况下,范围更广的圣阿尔诺金矿历来生产超过11 970公斤黄金,仍然是勘探的重点。
The broader St Arnaud goldfield, historically producing over 11,970 kg of gold, remains a focus for exploration amid rising gold prices.