肯塔基州科文顿和纽波特之间的第四街大桥于2026年3月2日提前一个月被控制爆炸摧毁,为2028年开通的新大桥铺平了道路。
The Fourth Street Bridge between Covington and Newport, Kentucky, was demolished by controlled blast on March 2, 2026, one month early, to make way for a new bridge set to open in 2028.
Covington与肯塔基州Newport之间的第四街桥于2026年3月2日被拆除,
The Fourth Street Bridge between Covington and Newport, Kentucky, was demolished on March 2, 2026, using a controlled blast at 10:01 a.m., one month ahead of schedule.
这座自1月以来关闭的90年大桥正被9 960万美元的结构所取代,结构包括三座钢铁拱门、四条交通道以及专用自行车和行人道,预计到2028年夏季将开通。
The 90-year-old bridge, closed since January, is being replaced by a $99.6 million structure with three steel arches, four traffic lanes, and dedicated bike and pedestrian paths, expected to open by summer 2028.
碎片掉进Licking河,驳船取回金属废料。
Debris fell into the Licking River, with barges recovering metal scraps.
为期两年的关闭已经生效,有备用路线和免费班车服务。
A two-year closure is in effect, with alternate routes and a free shuttle service available.
允许在俄亥俄河沿线指定地点进行公众观看。
Public viewing was permitted at designated spots along the Ohio River.