BLM批准扩大内华达州的银峰锂矿, 以提升美国电池矿产产量。
The BLM approved expanding Nevada’s Silver Peak lithium mine to boost U.S. battery mineral production.
土地管理局已批准扩大内华达州的银峰锂矿,允许Albemarle公司经营8 058英亩土地,包括1 601英亩公用土地。
The Bureau of Land Management has approved the expansion of the Silver Peak lithium mine in Nevada, allowing Albemarle Corporation to operate on 8,058 acres, including 1,601 acres of public land.
该项目旨在利用新技术使锂回收率翻番,支持美国努力推动国内生产用于电动汽车电池和能源储存的关键矿物。
The project, which aims to double lithium recovery using new technologies, supports U.S. efforts to boost domestic production of critical minerals for electric vehicle batteries and energy storage.
扩建包括新的基础设施,如水泵站、管道和盐池。
The expansion includes new infrastructure like pump stations, pipelines, and brine ponds.
公开评论期一直持续到2025年10月6日,并接受到2025年3月31日的补充意见。
A public comment period runs until October 6, 2025, with additional input accepted through March 31, 2025.