安大略正在多伦多海滨重建其科学中心,由于屋顶问题,在2024年Don Mills场址关闭后于2029年启用。
Ontario is rebuilding its Science Centre at Toronto’s waterfront, opening in 2029 after the 2024 closure of its Don Mills site due to roof concerns.
安大略省政府已经公布了在多伦多海滨新建一个10.4亿加元的安大略省科学中心的设计,该中心定于2029年开业。
The Ontario government has unveiled the design for a new $1.04 billion Ontario Science Centre at Toronto’s waterfront, set to open by 2029.
安大略科学合作伙伴根据一项为期30年的维护协议,将建造40万平方英尺的设施,其中包括互动展览、一个经过翻新的双座的Cinesephere设施以及一个新的舱面综合体。
The 400,000-square-foot facility, featuring interactive exhibits, a renovated Cinesphere with double seating, and a new pod complex, will be built by Ontario Science Partners under a 30-year maintenance agreement.
建筑于2026年春季开工,在港边中心临时编程,直到开工为止。
Construction begins in spring 2026, with temporary programming at Harbourfront Centre until opening.
该项目是在2024年关闭最初的Don Mills工地之后进行的,这是出于对屋顶安全的关注,尽管该建筑在大雪中幸存下来。
The project follows the 2024 closure of the original Don Mills site, cited due to roof safety concerns, though the building survived heavy snowfall.
重新开发包括一个热水公园、公共海滩、小径和一个更大的音乐会场地,对透明度、环境审查提出批评,并开展174万美元的广告活动。
The redevelopment includes a Therme waterpark, public beaches, trails, and a larger concert venue, drawing criticism over transparency, environmental review, and a $1.74 million advertising campaign.