2026年2月26日,马萨诸塞州一所学校因积雪引起的屋顶压力而疏散,未报告有人受伤。
A Massachusetts school evacuated on Feb. 26, 2026, due to snow-induced roof stress, with no injuries reported.
马萨诸塞州Hingham的一所学校于2026年2月26日撤离, 因为最近暴风雪造成大雪, 对普利茅斯河学校屋顶造成结构压力,
A school in Hingham, Massachusetts, was evacuated on February 26, 2026, after heavy snow from a recent blizzard caused structural stress on Plymouth River School’s roof, prompting officials to relocate students and staff to Hingham High School.
本周早些时候,屋顶专家一直在协助清除雪,一名结构工程师正在现场对大楼进行评估。
Roofing specialists had been assisting with snow removal earlier in the week, and a structural engineer was on site to assess the building.
据报没有人受伤,学生继续白天上课,在高中吃午餐,公共汽车提供交通。
No injuries were reported, and students continued their day with classes and lunch at the high school, with buses providing transportation.
学校仍然关闭,有待进一步评估,安全被列为最高优先事项。
The school remains closed pending further evaluation, with safety cited as the top priority.