INDOT建议重新设计美国31公里6英里处的交汇设施,以改善致命事故(包括涉及儿童的事故)后的安全,从2028年开始施工。
INDOT proposes redesigning 6 miles of U.S. 31 with interchanges to improve safety after fatal crashes, including those involving children, with construction starting in 2028.
印地安那交通部提议,在包括儿童在内的致命事故发生后,在马歇尔州和富尔顿州对美国31公里长的一段6英里长的公路进行以安全为重点的重新设计。
The Indiana Department of Transportation is proposing a safety-focused redesign of a 6-mile stretch of U.S. 31 in Marshall and Fulton counties, following fatal crashes, including those involving children.
该计划由公众反馈形成,包括用交换和过道取代九个交叉点,以减少冲突点,从今年夏天开始,在10号国道临时减少冲突交叉点,并定于2028年全面修建。
The plan, shaped by public feedback, includes replacing nine intersections with interchanges and overpasses to reduce conflict points, with a temporary reduced conflict intersection at State Road 10 starting this summer and full construction set for 2028.
INNOT将交通圈和永久减少的冲突交叉点从提案中删除,并正在考虑保留一些现有的交叉点,以维持农业、紧急服务和当地交通的准入。
INDOT has removed traffic circles and permanent reduced conflict intersections from the proposal and is considering retaining some existing intersections to maintain access for agriculture, emergency services, and local traffic.
预计将于2027年初举行关于最终计划和费用的公开听证会。
A public hearing on final plans and costs is expected in early 2027.