Banyan Gold在育空地区启动了40M钻探计划,
Banyan Gold started a $40M drilling program in Yukon to expand high-grade gold and silver at AurMac, targeting deeper and longer mineralization.
Banyan Gold在育空地区的Tombstone Gold Belt的AurMac项目启动了一个资金充足的40,000米钻石钻探计划,重点是扩大Airstrip和Powerline矿床的高等级金银区。
Banyan Gold has launched a fully funded 40,000-meter diamond drilling program at its AurMac Project in Yukon’s Tombstone Gold Belt, focusing on expanding high-grade gold and silver zones at the Airstrip and Powerline deposits.
2026年的勘探活动优先将矿化工作与罢工和下陷结合起来,80%的预算拨款用于这些目标。
The 2026 exploration campaign prioritizes extending mineralization along strike and down-dip, with 80% of the budget allocated to these targets.
其余20%将利用地球物理、土壤取样和AI驱动的分析,测试720平方千米陆地包件中10个先前尚未勘探的区域前景,以确定与入侵有关的金系统可能减少。
The remaining 20% will test 10 previously unexplored regional prospects across the 720-square-kilometer land package using geophysics, soil sampling, and AI-driven analysis to identify potential reduced intrusion-related gold systems.
95%以上的土地尚未开垦,项目位于Mayo附近,可通过高速公路进入。
Over 95% of the land remains undrilled, and the project lies near Mayo, accessible via highway.
支持工作包括冶金测试、环境研究和预期2026年底进行的初步经济评估。
Supporting work includes metallurgical testing, environmental studies, and a preliminary economic assessment expected by late 2026.