泛全球资源组织在西班牙的埃斯卡塞纳项目上报告了大量铜、锡、银、黄金和铜资源,有可能扩展,并有一个可行的起始坑。
Pan Global Resources reports significant copper, tin, silver, gold, and copper resources at its Escacena Project in Spain, with potential for expansion and a viable starter pit.
泛全球资源公司为其在西班牙南部的埃斯卡塞纳项目提交了一份NI 43-101技术报告,报告了截至2025年12月31日的初步矿物资源估计数。
Pan Global Resources has filed an NI 43-101 Technical Report for its Escacena Project in southern Spain, reporting initial mineral resource estimates as of December 31, 2025.
La Romana矿藏含有3 240万吨测量和标明的资源,其中铜119.5千吨,锡8.8千吨,银170万盎司,另加400万吨推定资源。
The La Romana deposit contains 32.4 million tonnes of Measured and Indicated resources with 119.5 kilotonnes of copper, 8.8 kilotonnes of tin, and 1.7 million ounces of silver, plus 4.0 million tonnes in Inferred resources.
卡尼亚达本田储金存有500万吨的推定资源,含金104 000盎司,铜6.8千吨,银20万盎司。
The Cañada Honda deposit holds 5.0 million tonnes in Inferred resources with 104,000 ounces of gold, 6.8 kilotonnes of copper, and 0.2 million ounces of silver.
这两笔存款都显示出扩展的潜力,La Romana表示有一个可行的起始坑。
Both deposits show potential for expansion, with La Romana indicating a viable starter pit.
该报告由独立专家编写,为未来的发展研究提供了支持。
The report, prepared by independent experts, supports future development studies.