日期线资源公司在其加利福尼亚金矿和稀土项目中完成了地球物理调查,为即将到来的钻石钻探铺平了道路。
Dateline Resources completed a geophysical survey at its California gold and rare earths project, paving the way for upcoming diamond drilling.
日期线资源公司在其加利福尼亚Colosseum黄金和稀土项目完成了详细的地球物理调查,推进了钻石钻探计划。
Dateline Resources has finished a detailed geophysical survey at its Colosseum gold and rare earths project in California, advancing plans for diamond drilling.
调查包括8.6平方公里的重力、磁力和辐射测量数据,以先前的IP和MT结果为基础,更好地确定与黄金和稀土有关的深层结构。
The survey included gravity, magnetic, and radiometric data across 8.6 square kilometers, building on prior IP and MT results to better define deep structures linked to gold and rare earths.
正在对数据进行分析,以确定高潜力的钻探目标,不久将开始钻探。
Data is being analyzed to identify high-potential drill targets, with drilling set to begin soon.
该项目拥有平均1.26克/吨黄金的2 710万吨资源,根据今天的黄金价格(每盎司近4 990美元),最新经济情况很可能有所改善。
The project holds a 27.1 million tonne resource averaging 1.26 g/t gold, with updated economics likely improved by today’s gold price near $4,990 per ounce.