印度铁路在11年中通过重大升级和安全改进,将信号失灵率削减58%。
Indian Railways cut signalling failures by 58% in 11 years via major upgrades and safety improvements.
印度铁路报告说,由于主要现代化,在11年内信号失效减少了58%,包括6660个车站的电子互锁,6665个车站的轨道循环,6,142个街区的轴数计数器和6,625公里内的自动街区信号.
Indian Railways reports a 58% drop in signalling failures over 11 years due to major modernisation, including electronic interlocking at 6,660 stations, track circuiting at 6,665 stations, axle counters on 6,142 block sections, and automatic block signalling across 6,625 km.
10 097个地点的跨边界关口、冗余系统和滚动区块维护计划提高了可靠性。
Interlocked level crossing gates at 10,097 locations, redundant systems, and a rolling block maintenance plan have boosted reliability.
严格的安全规程、工作人员培训和升级的工人用具 -- -- 类似反射背心、头盔和电池动力工具 -- -- 改善了安全和效率,导致事故大幅减少。
Strict safety protocols, staff training, and upgraded worker gear—like reflective vests, helmets, and battery-powered tools—have improved safety and efficiency, contributing to a significant decline in accidents.