Thor勘探公司发现其在塞内加尔的杜塔黄金项目在经济方面很有希望,其高回报率和首次产量定于2028年。
Thor Explorations finds its Douta Gold Project in Senegal economically promising, with high returns and first production set for 2028.
Thor勘探公司报告说,对塞内加尔的杜塔黄金项目进行的可行性初步研究取得了积极成果,显示出强大的经济潜力,税前NPV为9.08亿美元,IRR为73%,每盎司黄金价格为3 500美元。
Thor Explorations reports positive results from a pre-feasibility study for its Douta Gold Project in Senegal, showing strong economic potential with a pre-tax NPV of $908 million and an IRR of 73% based on a $3,500/ounce gold price.
该项目的资本成本为2.54亿美元,使用寿命为12.6年,预计将生产100万盎司黄金,首次生产目标是2028年初。
The project, which features a $254 million capital cost and 12.6-year life, is expected to produce 1.0 million ounces of gold, with first production targeted for early 2028.
该公司已获得环境批准,完成了收购合资企业伙伴股权的交易,并正在朝最后敲定《采矿公约》和详细设计的方向迈进。
The company has secured environmental approval, finalized a deal to acquire its joint venture partner’s stake, and is advancing toward finalizing the Mining Convention and detailed design.
正在进行的勘探继续扩大资源范围。
Ongoing exploration continues to expand the resource.