Noble Corp赢得了13亿美元的新合同,其中包括自2027年第二季度起签订的挪威交易,使车队利用率提升至92%。
Noble Corp wins $1.3B in new contracts, including a Norway deal starting Q2 2027, boosting fleet utilization to 92%.
Noble Corporation获得了13亿美元的新合同,从2027年第二季度起与Noble GreatWhite签订为期三年的协议,进入挪威恶劣环境市场,重新激活费用为1.6亿美元。
Noble Corporation secured $1.3 billion in new contracts, expanding into Norway’s harsh environment market with a three-year deal for the Noble GreatWhite starting Q2 2027, requiring $160 million in reactivation costs.
其他裁决包括尼日利亚与Esso的钻探合同,圭亚那合同延长至2029年,以及美国海湾、南美洲和特立尼达的新的工作和多井工程项目。
Additional awards include a Nigeria drilling contract with Esso, Guyana contract extensions through 2029, and new workover and multi-well projects in the U.S. Gulf, South America, and Trinidad.
这些合同使车队利用率提高到92%,尽管2026年的准备费用为5 000万美元,但预期的EBITDA和自由现金流动率仍有所提高。
These contracts raise fleet utilization to 92%, boosting expected EBITDA and free cash flow despite $50 million in 2026 preparation costs.