卡杜纳州承诺,在重大基础设施升级和投资之后,到2026年底,100%供水。
Kaduna State pledges 100% water access by late 2026 after major infrastructure upgrades and investments.
卡杜纳州州长乌巴·萨尼承诺到2026年底实现100%的供水覆盖率,因为两年半内水产量从8%增至30%以上。
Kaduna State Governor Uba Sani pledged 100% water coverage by late 2026, following a rise in water production from 8% to over 30% in two and a half years.
他提到多年的忽视,包括休眠处理厂和被破坏的基础设施,是其根本原因。
He cited years of neglect, including dormant treatment plants and damaged infrastructure, as root causes.
国家从2024年到2027年投资930亿至1 000亿日元,用于系统升级,包括更换受损管道、安装重要管道、清结拖欠的电力,以确保不间断的泵运作。
The state has invested between ₦93 billion and ₦100 billion from 2024 to 2027 to upgrade systems, including replacing damaged pipes, installing critical pipelines, and clearing electricity arrears to ensure uninterrupted pump operations.
超过9.0亿英镑的工作人员拖欠薪金已经结清,土地被分配用于工人住房。
Over ₦900 million in staff salary arrears were settled, and land was allocated for worker housing.
与国家水资源研究所合作,将在扎里亚和卡奇亚设立分支机构,以改善培训和劳动力专业知识。
Collaboration with the National Water Resources Institute will establish branches in Zaria and Kachia to improve training and workforce expertise.