Aurum Resources报告说,科特迪瓦Boundiali的黄金品位很高,计划进行大量钻探,并进行了2026年可行性初步研究。
Aurum Resources reports high-grade gold at Boundiali, Côte d’Ivoire, with plans for extensive drilling and a 2026 prefeasibility study.
Aurum Resources报告说,该公司在科特迪瓦的Boundiali项目进行填充钻井钻探,并多次进行高档拦截,包括以27.13克/吨的1.5米和以31.24克/吨的1米进行拦截,从而获得高档黄金。
Aurum Resources reports strong high-grade gold results from its infill drilling at the Boundiali project in Côte d’Ivoire, with multiple high-grade intercepts including 1.5 meters at 27.13 g/t and 1 meter at 31.24 g/t.
矿化工作设在一个自由运沙石单位内,沿13公里长的走廊和深度继续开放。
The mineralization, hosted in a free-milling sandstone unit, remains open along a 13-kilometer corridor and at depth.
Aurum计划利用4 010万美元的现金在Boundiali钻探多达100 000米,在Napié钻探多达30 000米,目标是更新资源估计数和在2026年年中前对露天矿井进行初步可行性研究。
With $40.1 million in cash, Aurum plans up to 100,000 meters of drilling at Boundiali and 30,000 meters at Napié, targeting updated resource estimates and a prefeasibility study for an open-pit mine by mid-2026.