Adani Energy Solutions赢得了18 000卢比的HVDC项目,将2 500兆瓦的可再生能源从古吉拉特传输到奥尔帕德,扩大其传输网络并提高效率。
Adani Energy Solutions won an Rs 18,000 crore HVDC project to transmit 2,500 MW of renewable energy from Gujarat to Olpad, expanding its transmission network and boosting efficiency.
Adani Energy Solutions Limited拥有一个18 000卢比的HVDC项目,从古吉拉特的Khavda可再生能源园向奥尔帕德传输2 500兆瓦的可再生能源,将传输网络扩大到27 901公里,将转换能力提高到118 175兆瓦。
Adani Energy Solutions Limited secured an Rs 18,000 crore HVDC project to transmit 2,500 MW of renewable energy from Gujarat’s Khavda Renewable Energy Park to Olpad, expanding its transmission network to 27,901 circuit kilometers and boosting transformation capacity to 118,175 MVA.
该公司的订单书已达77,787卢比。
The company’s order book reached Rs 77,787 crore.
分配效率提高,26财政年度的损失降至4.22%,供应可靠性达到99.998%。
Distribution efficiency improved, with losses dropping to 4.22% year-to-date in FY26 and supply reliability at 99.998%.
孟买的电力销售略有下降,但收集效率仍保持在101.75%。
Mumbai’s electricity sales dipped slightly, but collection efficiency stayed strong at 101.75%.
智能电表安装量增加了18.88万, 总数达到925万, 预计到年底将超过1亿.
Smart meter installations rose by 18.88 lakh, bringing the total to 92.5 million, with expectations to exceed one crore by year-end.
智能计量订单书的价值为29 519卢比,全国市场机会为1.03亿套。
The smart meter order book is valued at Rs 29,519 crore, with a national market opportunity of 103 million units.
AESL报告H1 FY26和Q2的收入年同比增长16%,在稳定业务和资本支出增加的驱动下,H1 FY26和Q2分别增长6%和6%。
AESL reported 16% year-on-year income growth in H1 FY26 and 6% in Q2, driven by stable operations and higher capital expenditure.