都柏林Waterford列车干扰了2026年1月-Mar的防洪和铁路升级。
Dublin-Waterford trains disrupted Jan–Mar 2026 for flood prevention and rail upgrades.
2026年1月至3月,由于Waterford的Plunkett站防洪和铁路升级,都柏林和Waterford之间的列车服务将中断,这是北Quays发展的一部分。
Train services between Dublin and Waterford will be disrupted from January to March 2026 due to flood prevention and rail upgrades at Waterford’s Plunkett Station, part of the North Quays development.
星期一至星期四上午8时至下午2时30分的工作将包括更换旧的信号系统,恢复跟踪能力,以及减少今后的洪水风险。
Work from 8 a.m. to 2:30 p.m., Monday through Thursday, will include replacing an old signaling system, restoring track capacity, and reducing future flood risks.
受影响的超峰列车将在Kilkenny或Carrick-on-Suir终止,需要公交车。
Affected off-peak trains will terminate at Kilkenny or Carrick-on-Suir, requiring bus transfers.
建议乘客在旅行前检查更新情况。
Passengers are advised to check for updates before traveling.