塞尔维亚总统武西奇赞扬了中国建造的多瑙河走廊高速公路,称它为关键的发展里程碑。
Serbian President Vucic praised the Chinese-built Danube Corridor highway, calling it a key development milestone.
塞尔维亚总统阿列克桑达尔·武西奇于2025年12月29日在戈卢巴茨视察了中国建造的多瑙河走廊快道,赞扬了该走廊的进展和建设质量。
Serbian President Aleksandar Vucic inspected the Chinese-built Danube Corridor fast road in Golubac on December 29, 2025, praising its progress and construction quality.
连接塞尔维亚东部与贝尔格莱德和E75国际航线的68公里高速公路正按计划于2026年全面竣工,31.85公里已开通。
The 68-kilometer highway, linking eastern Serbia to Belgrade and the E75 international route, is on track for full completion by 2026, with 31.85 kilometers already open.
Vucic说,该项目将促进区域连通性、经济增长、投资、旅游业和人口回报。
Vucic said the project will boost regional connectivity, economic growth, investment, tourism, and population return.
他重申塞尔维亚支持一个中国原则,并感谢中国的合作,认为该项目是一个重大发展里程碑。
He reaffirmed Serbia’s support for the one-China principle and thanked China for its cooperation, calling the project a major development milestone.
中国大使李明和塞尔维亚官员陪同了这次访问。
Chinese Ambassador Li Ming and Serbian officials accompanied the visit.