波兰承诺向CPK机场提供1.09B欧元,该机场定于2032年开通,有两条跑道和34M年容量。
Poland commits €1.09B to CPK airport, set to open in 2032 with two runways and 34M annual capacity.
波兰机场SA承诺,在2025年12月15日协议之后,到2032年将投资约10.9亿欧元,用于波兰中央港科穆尼卡西尼(CPK)机场项目。
Polish Airports SA has committed to investing approximately EUR1.09 billion in Poland’s Centralny Port Komunikacyjny (CPK) airport project by 2032, following a December 15, 2025, agreement.
该机场定于2032年开通,有两条跑道和3 400万年客运能力,其特点是2026年开工的终点站和预计2029年开工的地下铁路连接线。
The airport, set to open in 2032 with two runways and a 34-million-passenger annual capacity, will feature a terminal starting construction in 2026 and an underground rail link expected by 2029.
该项目是一个更大的运输枢纽的一部分,旨在增强波兰的空中连通性。
The project, part of a larger transportation hub, aims to boost Poland’s air connectivity.
PPL持有获得项目100%股份的选择权。
PPL holds the option to acquire up to 100% of the project’s shares.