肯尼亚将电网升级为新的132kV线路,以提高可靠性和能源供应。
Kenya upgrades power grid with new 132kV line to boost reliability and energy access.
总统鲁托(William Ruto)已委托肯尼亚使用65公里长的132公里V Lessos-Kabarnet传输线, 取代已过时的33公里V系统, 以提高Baringo州和Elgeyo-Marakwet县的电力可靠性。
President William Ruto has commissioned the 65-kilometer, 132kV Lessos–Kabarnet Transmission Line in Kenya, replacing an outdated 33kV system to improve electricity reliability in Baringo and Elgeyo-Marakwet counties.
该项目是15亿先令投资的一部分,它加强了电网的稳定,减少了断电量,并支持地热、水电和风能的一体化。
The project, part of a Sh1.5 billion investment, enhances grid stability, reduces outages, and supports integration of geothermal, hydropower, and wind energy.
它能够为医院、学校、企业和工业提供稳定的权力,促进经济增长和创造就业。
It enables stable power for hospitals, schools, businesses, and industries, boosting economic growth and job creation.
这条线还为今后与卡巴内特-鲁穆鲁提传输走廊的连接铺平了道路,加强了国家能源供应和复原力。
The line also paves the way for future connections to the Kabarnet–Rumuruti transmission corridor, strengthening national energy access and resilience.