Beetetaloo能源在其Carpentaria-5H油井中创下了创纪录的天然气流量,预期到2026年年中将首次销售。
Beetaloo Energy hit record gas flows in its Carpentaria-5H well, with first sales expected by mid-2026.
Beetaloo能源公司报告说,北部领土Capentaria-5H井的天然气流量强劲,达到每天11.2兆兆焦耳的峰值,平均每天7.1兆焦耳,试验端6.3兆焦耳/日稳定,是贝塔鲁盆地最高的之一。
Beetaloo Energy reports strong gas flow from its Carpentaria-5H well in the Northern Territory, achieving a peak rate of 11.2 terajoules per day and averaging 7.1 TJ/day, with a steady 6.3 TJ/day at test end—among the highest in the Beetaloo Basin.
尽管仍在脱水和仅恢复了23%的刺激液,但低下降率表明长期潜力很大。
Despite still dewatering and recovering only 23% of stimulation fluid, the low decline rate suggests strong long-term potential.
该公司使用限制锁塞来保持骨折似乎加强了骨折网络,增加了恢复的前景。
The company’s use of a restricted choke to preserve fractures appears to have enhanced the fracture network, boosting recovery prospects.
独立分析证实,附近每个油井有10个可回收的2C气体。
Independent analysis confirms 10 petajoules of recoverable 2C gas per well site nearby.
Beetetaloo已获得对Carpentaria试点项目的所有批准,与北部地区签订了10年天然气销售协议,土木工程正在进行中,并正在整修设备以便搬迁。
Beetaloo has secured all approvals for its Carpentaria Pilot project, with a 10-year gas sales agreement with the Northern Territory, civil works underway, and equipment being refurbished for relocation.
预计2026年下半年将进行第一批天然气销售,并计划于2026年初进行延长流量测试。
First gas sales are expected in the second half of 2026, with an extended flow test planned for early 2026.