沃斯特郡议会在道路状况恶化期间,从2022年到2024年支付了31,223英的坑道损坏索赔.
Worcestershire Council paid £31,223 in pothole damage claims from 2022 to 2024 amid worsening road conditions.
2022年4月至2024年3月期间,Wworstershire县议会支付了31,223.16英镑的坑洞损坏赔偿金,涉及374项索赔。
Worcestershire County Council paid £31,223.16 in compensation for pothole damage between April 2022 and March 2024, covering 374 claims.
2022/23年度的付款总额为17 714.14英镑,2023/24年度的付款总额为13 509.02英镑。
Payments totaled £17,714.14 in 2022/23 and £13,509.02 in 2023/24.
这些数字与国家趋势相一致,因为与天气有关的道路恶化增加了与坑洞有关的索赔和车辆损坏,特别是对骑自行车者而言。
The figures align with national trends, as weather-related road deterioration increases pothole-related claims and vehicle damage, especially for cyclists.
包括Tallow Hill在内的几个Worcester循环路径受到严重破坏。
Several Worcester cycle paths, including Tallow Hill, are severely damaged.
该理事会使用基于风险的系统检查其4 000公里公路网络,并敦促居民在线报告问题。
The council uses a risk-based system to inspect its 4,000km road network and urges residents to report issues online.
据RAC报告,2024年10月至2025年9月期间,英格兰和威尔士共发生25 000多起与坑洞有关的故障,估计每平方英里有6个坑洞。
The RAC reported over 25,000 pothole-related breakdowns in England and Wales between October 2024 and September 2025, estimating six potholes per square mile.