由于电网升级和能源改革,加纳在创纪录的需求中保持了稳定电力供应。
Ghana maintained stable power amid record demand, thanks to grid upgrades and energy reforms.
加纳能源部长Jinapor博士(John Abdulai Jinapor)向公众保证了稳定的电力供应, 尽管2025年12月创下了创纪录的最高需求4300兆瓦,
Ghana’s Energy Minister Dr. John Abdulai Jinapor has assured the public of stable power supply despite a record December 2025 peak demand of 4,300 megawatts, driven by the holiday season.
他列举了提高电网抗御能力以及目前为促进石油生产、扩大可再生能源和加强合同监督所作的努力。
He cited improved grid resilience and ongoing efforts to boost petroleum production, expand renewables, and strengthen contract oversight.
通过35个项目, 加纳电力公司 (ECG) 启动了备用团队, 升级基础设施, 并促进无现金支付, 以管理需求和改善服务.
The Electricity Company of Ghana (ECG) in Ashanti activated standby teams, upgraded infrastructure through 35 projects, and promoted cashless payments to manage demand and improve service.