在澳大利亚北部Tunkillia S1 Pit的钻探作业中发现的高级金矿,其结果有待全面分析。
High-grade gold found in drilling at Australia’s Northern Tunkillia S1 Pit, with results pending full analysis.
最近澳大利亚北部Tunkillia S1Pit的填充钻探方案产生了高品位的黄金结果,包括从88米深到每吨11.2克的2米,从45米到每吨5.21克的10米。
A recent infill drilling program at Australia's Northern Tunkillia S1 Pit has yielded high-grade gold results, including 2 meters at 11.2 grams per tonne from 88 meters depth and 10 meters at 5.21 grams per tonne from 45 meters.
其他分析显示3米,每吨9.70克;17米,每吨2.23克。
Additional assays showed 3 meters at 9.70 grams per tonne and 17 meters at 2.23 grams per tonne.
这些成果是第一阶段升级钻探举措的一部分,其余数据预计于2026年1月提供,更新的JORC(2012年)矿物资源估计数预计于2026年3月提供。
These results are part of a Phase 1 upgrade drilling initiative, with remaining data expected in January 2026 and an updated JORC (2012) Mineral Resource Estimate anticipated by March 2026.