2025年,罗马尼亚在政策和储存增长的驱动下,太阳能发电能力猛增2.5千兆瓦,同时面临债务上升和高调调查。
Romania surged solar energy capacity by 2.5 GW in 2025, driven by policy and storage growth, while facing rising debt and a high-profile probe.
罗马尼亚在2025年增加了2.5千兆瓦太阳能光电容量,比2024年增加了45%,成为欧洲前十名中增长最快的太阳能市场,占预计每年7.6千兆瓦太阳能发电总量的三分之一。
Romania added 2.5 gigawatts of solar PV capacity in 2025, a 45% increase from 2024, making it the fastest-growing solar market among Europe’s top ten and accounting for about one-third of its projected 7.6 GW annual total.
增长的驱动力是支持性政策、精简的许可和增加的电池储存部署。
The growth is driven by supportive policies, streamlined permitting, and rising battery storage deployment.
与此同时,罗马尼亚最大的电池储存设施 -- -- 200 MW/400 MWh -- -- 在Cluj县Floreti开通,作为更广泛推动稳定电网和整合可再生能源的一部分。
In parallel, Romania’s largest battery storage facility—200 MW/400 MWh—opened in Florești, Cluj County, as part of a broader push to stabilize the grid and integrate renewables.
到2025年10月,该国外债超过2,250亿欧元,比1月增加了220亿欧元。
The country’s external debt reached over 225 billion euros by October 2025, up 22 billion from January.
罗马尼亚的AI创业公司Runware获得了5000万美元的A轮融资, 检察官还挖出了前司法部长Rodica Stănoiu的尸体,
Meanwhile, a Romanian AI startup, Runware, raised $50 million in Series A funding, and prosecutors exhumed the body of former justice minister Rodica Stănoiu in a probe into her suspicious death.