Ayodyya的Ram Temple在12月31日普兰普拉蒂什塔(Pran Pratishtha)之前为每日200,000名朝圣者做准备。
Ayodhya’s Ram Temple prepares for 200,000 daily pilgrims ahead of December 31 Pran Pratishtha.
Shri Ram Janmabhoomi Teerth Kshetra信托基金正准备大批朝圣者涌入阿约迪亚的拉姆寺庙, 实施人群控制措施,
The Shri Ram Janmabhoomi Teerth Kshetra Trust is preparing for a major influx of pilgrims at Ayodhya’s Ram Temple, implementing crowd control measures including two new shoe storage facilities that can hold 25,000 pairs at once and manage up to 200,000 daily.
在安全机构的投入下,正在建造一条3.5公里长的隔离墙,但尚未确定完工日期。
A 3.5-kilometre boundary wall is under construction with input from security agencies, though no completion date has been set.
该信托机构正在前木制建筑工地建造一座新寺庙,直到2024年1月,Ram Lalla一直被庄严地埋葬在那里。
The trust is building a new temple at the site of the former wooden structure where Ram Lalla was enshrined until January 2024.
Pran Pratishtha Ekadashi定于12月31日, 国防部长Rajnath Singh确认出席, 莫迪总理先前通过拉起红花“Dharma Dhwaj”, 象征性地完成了建筑工程。
Pran Pratishtha Ekadashi is set for December 31, with Defence Minister Rajnath Singh confirmed to attend, and Prime Minister Modi previously symbolically completed construction by hoisting the saffron 'Dharma Dhwaj'.