JSW能源保证25年交易,向Karnataka供应400兆瓦,促进稳定和增长。
JSW Energy secures 25-year deal to supply 400 MW to Karnataka, boosting stability and growth.
JSW Energy的子公司JSW Energy (Utkal) Ltd与Karnataka分销公司签署了为期25年的电力购买协议,从2026年4月1日起供应400兆瓦电力,每千瓦5.78瓦。
JSW Energy’s subsidiary, JSW Energy (Utkal) Ltd, has signed a 25-year Power Purchase Agreement with Karnataka distribution companies to supply 400 MW of power starting April 1, 2026, at ₹5.78 per kWh.
这笔交易将公司未签约的电力能力减少到5%,从而改善了收入稳定。
The deal reduces the company’s uncontracted power capacity to 5%, improving revenue stability.
它使锁定发电总能力达到30.5千兆瓦,包括13.3千兆瓦投入运行,12.4千兆瓦正在建造中,以及29.4千兆瓦时的能源储存。
It brings total locked-in generation capacity to 30.5 GW, including 13.3 GW operational and 12.4 GW under construction, along with 29.4 GWh of energy storage.
该公司仍然有望到2030年达到30千兆瓦发电量和40千兆瓦小时储存量,目标是到2050年实现碳中和。
The company remains on track to reach 30 GW of generation and 40 GWh of storage by 2030, with a goal of carbon neutrality by 2050.
在宣布之后,在一项筹资计划和行政变动的支持下,其份额大幅上升。
Its shares rose significantly following the announcement, supported by a fundraising plan and executive changes.