Capella Minerals开始在芬兰的金层项目中钻探钻石,目标是通过地球化学取样确定的高等级地区。
Capella Minerals began diamond drilling at its Finnish gold-copper project, targeting high-grade zones identified by geochemical sampling.
Capella Minerals已开始首次在芬兰北部的Killerö金库项目钻探钻石,目标是中拉普兰绿石带的Killerö E异常点。
Capella Minerals has started its first diamond drilling at the Killerö gold-copper project in northern Finland, targeting the Killerö E anomaly within the Central Lapland Greenstone Belt.
初始阶段包括总共2 200米的11个洞,重点是Till基地地球化学取样所查明的1公里宽,显示黄金和铜含量升高。
The initial phase includes 11 holes totaling 2,200 meters, focusing on a 1-kilometer stretch identified by Base of Till geochemical sampling showing elevated gold and copper.
钻探工作根据2025年9月2日与土耳其公司Tümad的收益协议全额资助,将于12月22日至1月2日暂停,并于2026年1月3日恢复。
Drilling, fully funded under a September 2, 2025, earn-in agreement with Turkish firm Tümad, will pause from December 22 to January 2 and resume January 3, 2026.
Capella还正在评估附近的Jolhikko和Seisunselka目标,它们具有Precambrian矿石制金系统的特点。
Capella is also evaluating nearby Jolhikko and Seisunselka targets with characteristics of Precambrian orogenic gold systems.
该公司在Killerö拥有80%的股份,在挪威的Løkken项目中持有10%的股份。
The company holds an 80% interest in Killerö and maintains a 10% carried interest in Norway’s Løkken project.