在安大略省南格伦加里重修桥梁,由于通货膨胀、材料和隐性损坏,费用超过100万美元。
Bridge renewal in South Glengarry, Ontario, costs over $1M more due to inflation, materials, and hidden damage.
根据多份当地报告,在安大略省南格兰加里修复两座桥梁的费用由于通货膨胀、材料成本上升和意外的结构问题而上涨了100万美元以上。
The cost to renew two bridges in South Glengarry, Ontario, has risen by over $1 million due to inflation, rising materials costs, and unforeseen structural issues, according to multiple local reports.
该项目对地方和区域运输至关重要,现在需要追加资金,以满足安全和耐久标准,尽管没有具体说明确切数字和原因。
The project, vital for local and regional transportation, now requires additional funding to meet safety and durability standards, though exact figures and causes were not specified.
官员确认这项工作仍在进行中,但没有宣布新的时间表或供资来源,突出表明加拿大各地在维持农村基础设施方面面临更广泛的挑战。
Officials confirm the work remains ongoing, but no new timeline or funding sources have been announced, highlighting broader challenges in maintaining rural infrastructure across Canada.