印度的MOIL公司在2025年11月的Nagarnar工厂创下了创纪录的产量,超过了100%的生产能力,产出和效率都达到了新的高水平。
India’s MOIL hit record production at its Nagarnar plant in November 2025, surpassing 100% capacity, with new highs in output and efficiency.
2025年11月,印度最大的锰矿石生产国莫伊勒(MOIL)在纳加纳尔工厂实现了创纪录的产量,超过关键单位100%的生产能力利用率,设定了原材料、烧烤和热金属的每日和月产量新高,同时实现了创纪录的每吨热金属519公斤的低燃料率。
In November 2025, India’s MOIL, the largest manganese ore producer, achieved record production across its Nagarnar plant, surpassing 100% capacity utilization in key units, setting new daily and monthly output highs for raw materials, sinter, and hot metal, while achieving a record-low fuel rate of 519 kg per tonne of hot metal.
该厂还推出了两个新的钢级,供基础设施使用,将转换器内衬寿命延长到4 799个热量,并通过节省电费提高效率。
The plant also launched two new steel grades for infrastructure use, extended converter lining life to 4,799 heats, and improved efficiency through power cost savings.
尽管中国廉价钢铁进口带来了挑战,但MOIL将其团队的操作纪律和技术升级归功于里程碑式的业绩。
Despite challenges from cheap Chinese steel imports, MOIL credited its team’s operational discipline and technological upgrades for the milestone performance.