印度Raipur-Vashakhapatnam高速公路将旅行时间从12小时缩短至5小时,定于2026年12月前完工。
India's Raipur-Visakhapatnam highway, cutting travel time from 12 to 5 hours, is set for completion by December 2026.
印度总理加提·沙克蒂(Gati Shakti)倡议的一部分,465公里的6-Lane Raipur-Vashakhapatnam经济走廊定于2026年12月前完工。
The 465-kilometre, six-lane Raipur-Visakhapatnam Economic Corridor, part of India’s PM Gati Shakti initiative, is set for completion by December 2026.
它将把两个城市之间的旅行时间从12小时缩短至5小时,并将路线长度从597公里缩短至465公里。
It will cut travel time between the two cities from 12 to five hours and reduce the route length from 597 to 465 kilometres.
为促进贸易和后勤,16 482卢比绿地公路将把恰蒂斯加尔和奥迪沙的工业区直接连接到Visakapatnam港和Chennai-Kolkata国家高速公路。
Designed to boost trade and logistics, the Rs 16,482 crore Greenfield highway will link industrial zones in Chhattisgarh and Odisha directly to Visakhapatnam Port and the Chennai-Kolkata National Highway.
该项目通过森林和部落地区,旨在改善区域发展,降低运费和燃料费用,以100公里/小时的速限加强安全,并提高土地价值。
Passing through forested and tribal areas, the project aims to improve regional development, reduce freight and fuel costs, enhance safety with a 100 km/h speed limit, and increase land values.