图尔萨在2025年12月1日午夜用盐水和盐水处理道路, 降雨和暴雪造成35起车祸和11人受伤.
Tulsa treated roads with brine and salt at midnight December 1, 2025, amid freezing rain and sleet that caused 35 crashes and 11 injuries.
图尔萨的车队在2025年12月1日午夜开始处理道路,使用盐水和盐来应对冰冷的雨和暴雪,这导致了危险的条件,多起车祸,以及整个地铁地区的交通延误.
Tulsa crews began treating roads at midnight on December 1, 2025, using brine and salt to combat freezing rain and sleet that caused hazardous conditions, multiple crashes, and traffic delays across the metro area.
该市部署了200多名工人和66辆卡车,优先考虑主要道路、桥梁和高风险地区,同时敦促司机减速,避免不必要的旅行。
The city deployed over 200 workers and 66 trucks, prioritizing major roads, bridges, and high-risk areas, while urging drivers to slow down and avoid unnecessary travel.
EMSA报告了35起交通事故——是正常事故率的八倍——其中11起受伤需要住院治疗。
EMSA reported 35 traffic accidents—eight times the normal rate—with 11 injuries requiring hospitalization.
该市在36条路线上保持1 770个车道里程,并启用了4个24/7暖化掩蔽所。
The city maintains 1,770 lane miles across 36 routes and has activated four 24/7 warming shelters.
建议居民将喷洒器换成手工方式,以防止冰的损坏。
Residents are advised to switch sprinklers to manual mode to prevent ice damage.