日期线资源公司在加利福尼亚Colosseum项目中发现了高品位黄金,强有力的钻探结果支持了深矿开采潜力。
Dateline Resources found high-grade gold at its California Colosseum project, with strong drill results supporting deep mining potential.
日期线资源公司报告称,在加利福尼亚州Colosseum项目中发现了大量黄金,钻探结果显示深度矿化强,包括1.53克/吨黄金的85.34米和1.18克/吨黄金的61.26米。
Dateline Resources reports significant gold discoveries at its Colosseum project in California, with drill results showing strong mineralization at depth, including 85.34 meters at 1.33 g/t gold and 61.26 meters at 1.18 g/t gold.
32洞、4 257米钻探活动加强了地质模型,推进了银行可担保可行性研究,为更深的露天坑或地下开发提供了支持。
A 32-hole, 4,257-meter drilling campaign strengthened the geological model and advanced the bankable feasibility study, supporting potential for a deeper open pit or underground development.
该项目持有2 710万吨黄金,每吨1.26克,共计110万盎司,预计净现值为5.5亿美元,IRR超过60%,每盎司黄金2 900美元。
The project holds 27.1 million tonnes at 1.26 g/t gold, totaling 1.1 million ounces, with a projected NPV of $550 million and IRR over 60% at $2,900 per ounce gold.
该公司还正在探索三个金矿的布雷契卡管目标,以及在芬尼特堤坝附近一个稀土异常点,其中一个矿址类似于山口矿址。
The company is also exploring three gold breccia pipe targets and a rare earths anomaly near fenite dykes, with one site resembling the Mountain Pass mine.
尚待进行其他检验。
Additional assays are pending.