2025年11月9日,在Katikati附近的NZ国家公路2路路工延误交通。
Roadwork delays traffic on NZ's State Highway 2 near Katikati on Nov. 9, 2025.
2025年11月9日,由于包括修树和排水修理在内的维修工作,Tauranga和Katikati之间的2号州公路上的交通仍然缓慢。
Slow-moving traffic on State Highway 2 between Tauranga and Katikati persists on November 9, 2025, due to maintenance work including tree trimming and drainage repairs.
上午7时至下午7时有停止/离开作业和30公里/小时速度限制,造成严重延误,一些司机报告说卡提卡提附近有30分钟的停顿。
Stop/Go operations and 30 km/h speed limits are in place from 7 a.m. to 7 p.m., causing significant delays, with some drivers reporting 30-minute standstills near Katikati.
新西兰运输局(NZTA)确认,热泉路和泰特利路之间的工作正在进行中,敦促谨慎行事和增加旅行时间。
The New Zealand Transport Agency (NZTA) confirmed the work is ongoing between Hot Springs Road and Tetley Road, urging caution and extra travel time.