诺福克金属公司(Norfolk Metals)在智利的Carmen项目2,176米处钻孔,
Norfolk Metals drills 2,176 meters at Chile’s Carmen project, targeting high-grade copper and gold.
诺福克金属公司(Norfolk Metals)正在智利的卡门项目中推进其少女钻探活动,完成了34个计划反向循环洞中的29个,共计2 176米,并计划在Higueritas Belt再钻两个洞。
Norfolk Metals is advancing its maiden drilling campaign at Chile’s Carmen project, completing 29 of 34 planned reverse circulation holes totaling 2,176 meters, with two additional holes planned in the Higueritas Belt.
该公司正在加速验证工作,将钻石钻探计划转换为RC,重新标出铜和黄金的历史核心,并将目标对准诸如63米高的铜区等高等级拦截点,即1.45%的铜。
The company is accelerating validation by converting diamond drill plans to RC, re-assaying historic core for copper and gold, and targeting high-grade intercepts like a 63-meter zone at 1.45% copper.
钻石钻机随后将进行2 575米的24/7钻探,以评估深硫化物。
A diamond rig will follow with 2,575 meters of 24/7 drilling to assess deeper sulphides.
预计本季度晚些时候的结果和数据,包括钻探计划和科,将支持符合JORC要求的资源。
Results and data, including drill plans and sections, are expected later in the quarter to support a JORC-compliant resource.