Barton Gold报告其南澳大利亚黄金项目取得了进展,钻探工作提前进行,预计很快会取得丰硕的早期结果。
Barton Gold reports progress at its South Australia gold project, with drilling ahead of schedule and strong early results expected soon.
Barton Gold Holdings公司报告说,它在南澳大利亚Tunkillia Gold Project的Tunkillia Gold Project的逆向循环钻井比计划提前,而且预算也低于计划,18 000米的钻井活动有三分之二已经完成。
Barton Gold Holdings reports its reverse circulation drilling at the Tunkillia Gold Project in South Australia is ahead of schedule and under budget, with two-thirds of the 18,000-meter campaign completed.
重点仍然是高品位的“入门坑”,特别是“第一阶段”,其初步结果包括每吨黄金 15.7 克的 10 米。
Focus remains on high-grade "Starter Pits," particularly "Stage 1," where initial results included 10 meters at 15.7 grams per tonne gold.
该公司的目标是将矿产资源升级至2012年JORC的“计量”和“指定”类别,以支持融资。
The company aims to upgrade mineral resources to JORC 2012 'Measured' and 'Indicated' categories to support financing.
预计中心“第1阶段”地区将很快取得初步调查结果。
First assay results from the central "Stage 1" area are expected soon.
该项目位于Gawler Craton,拥有完全允许的磨坊和附近的矿场,在2.5年内可产生365,000盎司黄金和13亿澳元的营业利润,并有强劲的早期现金流动回报。
The project, located in the Gawler Craton with a fully permitted mill and nearby mine, could yield 365,000 ounces of gold and A$1.3 billion in operating profit within 2.5 years, with strong early cash flow returns.
第二个钻探阶段计划于2026年3月至6月进行,目标是扩大矿化范围,支持地质技术和冶金研究。
A second drilling phase is planned for March–June 2026, targeting broader mineralization and supporting geotechnical and metallurgical studies.