Welland的圣乔治公园到2026年将成为0.7公顷的湿地,以恢复生境和改善流域健康。
St. George Park in Welland will become a 0.7-hectare wetland by 2026 to restore habitat and improve watershed health.
Welland St. George Park明年将变成一个湿地, 建造工程定于2026年春季或夏季开始。
Welland’s St. George Park will be transformed into a wetland next year, with construction set to begin in spring or summer 2026.
该项目由尼亚加拉半岛保护局牵头,将取代一个浅水泥池,代之以一个0.7公顷、两米深、由本地植物环绕的池塘和一个碎石小径。
The project, led by the Niagara Peninsula Conservation Authority, will replace a shallow concrete pond with a 0.7-hectare, two-metre-deep pond surrounded by native plants and a gravel walking trail.
这项努力旨在恢复生境和改善流域健康,这是国家湿地委员会为期25年的区域湿地恢复倡议的一部分。
The effort aims to restore habitat and improve watershed health, part of the NPCA’s 25-year regional wetland restoration initiative.
正在向尼亚加拉社区基金会、加拿大无限制鸭子和联邦方案寻求资金。
Funding is being sought from the Niagara Community Foundation, Ducks Unlimited Canada, and federal programs.
目前正在审查一项协定草案,最后设计和引文尚待确定。
A draft agreement is under review, with final designs and quotes pending.