Sarnia Sting将花费1.7M元提升竞技场, 全面控制食品销售,
The Sarnia Sting will spend $1.7M to upgrade their arena, gaining full control of food sales in exchange for ending the city’s share.
Sarnia Sting公司正在投资170万美元更新进步汽车销售竞技场,包括更换老化的厨房和特许设备,翻修Rinkside餐厅,重新开放社区特许摊位。
The Sarnia Sting are investing $1.7 million to upgrade the Progressive Auto Sales Arena, including replacing aging kitchen and concession equipment, renovating the Rinkside Restaurant, and reopening a community concession stand.
作为交换,该团队将全面控制食品和饮料业务,并保留所有销售佣金,结束该市50%的份额。
In exchange, the team will assume full control of food and beverage operations and keep all sales commissions, ending the city’s 50% share.
Sarnia市议会一致批准这项协议, 官员称其为双赢, 目的是改善粉丝体验,
Sarnia city council unanimously approved the deal, with officials calling it a win-win and aiming to improve fan experience and position the arena for future events like the Memorial Cup.
预计明年夏天之前将进行升级,尽管额外的资本需求可能需要未来的城市资金。
Upgrades are expected by next summer, though additional capital needs may require future city funding.