Orvana Minerals公司报告说,由于碾磨量减少,2025年Q4金和铜产量较低,但达到年度铜目标,并获得高等级延长。
Orvana Minerals reports lower Q4 2025 gold and copper output due to reduced milling, but meets annual copper target and finds high-grade extensions.
Orvana矿产公司报告说,西班牙Orovalle矿的产量为Q4 FY2025,产值为7 587盎司黄金,包括6 317盎司黄金和80万磅铜,低于上季度,原因是磨粉减少和品位降低。
Orvana Minerals Corp. reported Q4 FY2025 production from its Orovalle mine in Spain, yielding 7,587 gold equivalent ounces, including 6,317 gold ounces and 0.8 million pounds of copper, down from the prior quarter due to reduced milling and lower grades.
年产量达到35 705盎司黄金当量,黄金产量略低于准则,原因是季末停止有限加工,导致2026年库存。
Annual output reached 35,705 gold equivalent ounces, with gold production slightly below guidance, attributed to late-quarter stoping that limited processing and led to stockpiling for 2026.
铜的产量达到了其年度目标。
Copper output met its annual target.
该公司在Q4进行了2 652米的钻探,在A2区发现高等级拦截,在罢工时延长矿化40米,在垂直深度保持120米,支持资源扩张。
The company conducted 2,652 meters of drilling in Q4, identifying high-grade intercepts in Area A2, extending mineralization 40 meters along strike and maintaining 120 meters in vertical depth, supporting resource expansion.
2026年初仍有12,096吨湿吨的库存有待加工。
Stockpiles of 12,096 wet tonnes remain for processing in early 2026.