由于缺少批准和技术审查,利比里亚停止了Gbarnga桥项目50万美元。
Liberia halted a $500,000 Gbarnga bridge project due to missing approvals and technical review.
由于缺乏官方批准和技术审查,利比里亚公共工程部在邦州邦加停止了一个50万美元的桥梁项目,该项目由商人和政治领导人Musa Hassan Bility资助。
The Liberian Ministry of Public Works has halted a $500,000 bridge project in Gbarnga, Bong County, funded by businessman and political leader Musa Hassan Bility, due to lack of official approval and technical review.
Roland Layfette Gitings部长在2025年10月6日的一封信中列举了违反国家基础设施议定书的行为,包括没有事先协商或提交设计材料。
A October 6, 2025, letter from Minister Roland Layfette Giddings cited violations of national infrastructure protocols, including no prior consultation or design submission.
该项目旨在连接几个街区,以公开仪式启动,但暂停,直到提交适当的文件。
The project, meant to connect several neighborhoods and launched with a public ceremony, was paused until proper documentation is submitted.
该部申明,一旦实现遵守,将支持该倡议,并与主要官员分享通知。
The ministry affirmed its support for the initiative once compliance is achieved and shared the notice with key officials.
居民希望该项目将合法恢复。
Residents hope the project will resume legally.